Add parallel Print Page Options

The Temple Is Built

(1 Kings 6.1-38)

1-2 (A) Solomon's workers began building the temple in Jerusalem on the second day of the second month,[a] four years after Solomon had become king of Israel. It was built on Mount Moriah where the Lord had appeared to David at the threshing place that had belonged to Araunah[b] from Jebus.

The inside of the temple was 27 meters long and 9 meters wide, according to the older standards.[c] Across the front of the temple was a porch 9 meters wide and 9 meters[d] high. The inside walls of the porch were covered with pure gold.

Read full chapter

Footnotes

  1. 3.1,2 second month: Ziv, the second month of the Hebrew calendar, from about mid-April to mid-May.
  2. 3.1,2 Araunah: The Hebrew text has “Ornan,” another spelling of the name (see 2 Samuel 24.18-25; 1 Chronicles 21.18—22.1).
  3. 3.3 according to the older standards: There were possibly two different standards of measurement during Israel's history.
  4. 3.4 9 meters: Some manuscripts of two ancient translations; Hebrew “54 meters.”

He began building on the second day of the second month in the fourth year of his reign.(A)

The foundation Solomon laid for building the temple of God was sixty cubits long and twenty cubits wide[a](B) (using the cubit of the old standard). The portico at the front of the temple was twenty cubits[b] long across the width of the building and twenty[c] cubits high.

He overlaid the inside with pure gold.

Read full chapter

Footnotes

  1. 2 Chronicles 3:3 That is, about 90 feet long and 30 feet wide or about 27 meters long and 9 meters wide
  2. 2 Chronicles 3:4 That is, about 30 feet or about 9 meters; also in verses 8, 11 and 13
  3. 2 Chronicles 3:4 Some Septuagint and Syriac manuscripts; Hebrew and a hundred and twenty